Quick Guide: PV Solar Verification for the installer |
|
What you'll need: |
|
Helpful Information |
|
-Copy of CF-1R-PV |
|
+Generated
by
NSHP Calculator |
|
-Blank CF-6R-PV |
|
+Download
CF-6R-PV |
|
-Compass |
|
+Must
adjust for magnetic declination |
|
-Digital Level & tripod
|
|
+Both
available at Sears.com |
|
-Thermometer |
|
+Needs to measure ambient temp. |
|
-Pyronometer |
|
+Such
as
DayStar |
|
-Shade analysis tool
|
|
+SolarPathfinder.com
&
SolmetricSunEye |
|
-Tape Measure |
|
+Standard tape measure |
|
NSHP PV
Verification Process |
|
Visual
Inspection/Verification |
|
Helpful Information |
|
-Verify equipment model
#'s |
|
-Match field model #'s
to CF-1R-PV |
|
-Check if
California Flexible Install |
|
-150° - 270°, 4:12 -
7:12 |
|
-Verify array tilt &
azimuth |
|
-Use compass and level |
|
|
|
|
Performance Diagnostics |
|
|
|
-Measure solar
irradiance |
|
-Use Pyronometer |
|
-Measure ambient
temp in the shade |
|
-Use Thermometer |
|
-Verify output
meets or exceeds FVT |
|
-Field Verification
Table from CF-1R-PV |
|
|
|
|
|
Shading
Analysis |
|
|
|
-Check if minimally
shaded |
|
-Minimal shade means 'no
shade'. |
|
-Verify 2:1 D/H ratio of
roof obstructions |
|
-If roof is causing
shade |
|
-Verify D/H ratio or
altitude angle of trees |
|
-If trees are an issue |
|
-Verify D/H ratio of
existing/planned bldgs |
|
-If any planned or
existing buildings exist |
|
|
|
|
|
Documenting on
CF-6R-PV |
|
Photovoltaic System |
|
A. Fill in Meter Model
Number or write 'Built into Inverter' in box |
|
B. Fill in Inverter Model
Number in appropriate box |
|
C. Fill in Module Model
Numbers in appropriate box |
|
D. Fill in Series
modules in each string, # of Strings, & Total mods |
|
|
Installation Specifications |
|
1. Fill in Azimuth from
compass & write 'Compass' in "Method Used" |
|
2. Fill in Roof Pitch or
Tilt of install & write 'Digital Level' in "Method Used" |
|
3. Fill in Standoff
Height in appropriate box & "Method Used" ie.
Visual- 4" @ lowest |
|
4. Fill in Mounting
Height in box & "Method Used" ie. Visual-
Two Story Home |
|
|
Performance Specifications |
|
5. Fill in Solar
Irradiance and "Method Used" ie. Daystar Pyronometer 834
W/m2 |
|
6. Fill in Ambient
Temperature and "Method Used" ie. Digital Thermometer 82° |
7. Look up expected
output from FVT by crossing Ambient Temperature and
Solar
Irradiance to determine minimal expected output. Fill
in expected output in
box from the FVT within the CF-1R-PV. |
|
8. Fill in watt
output displayed at inverter within 1 minute of taking
irradiance. |
|
9. Was Minimal Shading
used on CF-1R-PV, write YES or NO in box. |
|
10.If any Existing and planned trees
causing shade, data should be in table. |
|
11.If shading exists, check
that it meets the 2:1 distance to height criteria. |
|
|
In-Field Shading Confirmation Table |
|
If there are any shading obstructions they should be
listed in the In-Field Shading |
|
confirmation table. Use the Solar Pathfinder or SunEye
to verify. |
|
|
|
Sign & Date - You're finished! |